The playroom! Insulated, plaster-boarded, concrete floor tiled throughout the same, painted and that´s it! I´ve used a variation of damp/water repellent plasterboard and the normal type, this would guarantee possible problematic areas to stay dry and keeping the atmosphere fresh as it should be.
Posted by Constructive solutionsPosted on 3:05 AM | No comments
So this is what the utility room ended up like. It´s practical, washer and dryer was stacked, saving a bit of space and a simple yet useful sink installed. Tilework blends in with the door opened onto the newly shower room seen through the door. Challenge completed!